Building permits in Germany: Bauvoranfrage, Bauantrag and permit exemption

In Germany the building authority (Bauaufsichtsbehörde) of the city or district decides whether a project may be built. Planning law is federal (the Building Code, BauGB, and the Land Use Ordinance, BauNVO); the procedure is set by each state's building code. Which projects need a permit, which are exempt and which papers are needed therefore differ from state to state.

Before you plan: the preliminary building enquiry

A Bauvoranfrage (preliminary building enquiry) asks the authority one or more specific questions before the full application: may a house of this size be built here, may it have three storeys, may the garage stand at the boundary? The answer, the Bauvorbescheid, binds the authority for some years, as the state's code sets. It is the safest way to settle a question before you buy land or pay for detailed plans.

Three kinds of procedure

  • Building permit (Baugenehmigung): the authority checks the project and issues a permit. Most states have a simplified procedure for ordinary residential buildings, in which the authority checks mainly planning law.
  • Permit exemption (Genehmigungsfreistellung): in many states, residential buildings that comply with a qualified development plan need no permit. The papers are submitted to the municipality, and building may start after a waiting period unless the municipality asks for a permit procedure. The owner remains responsible for complying with every rule.
  • No procedure (verfahrensfrei): small structures, such as garden sheds up to a certain size, need neither permit nor notice, but must still comply with the development plan and the setbacks.

Who submits the application

The building application (Bauantrag) must be signed by someone entitled to submit building documents (bauvorlageberechtigt), usually an architect or a civil engineer registered in Germany. They prepare the drawings and calculations and know the state's rules. The application goes to the lower building authority; in some states it is handed in at the municipality.

Where no development plan applies (§§ 34 and 35 BauGB), or where you need an exemption from a plan's rule, the municipality must agree (§ 36 BauGB).

Exemptions from the plan

If your project does not quite fit the development plan, the authority can grant an exception the plan itself provides for (Ausnahme), or an exemption (Befreiung) if the basic features of the plan are not affected and the deviation is justifiable (§ 31 BauGB). Neither is a right: apply for it with reasons.

Questions

Can I submit a building application myself?
In general, no. The application must be signed by a person entitled to submit building documents, usually an architect or civil engineer. Small projects may be excepted, depending on the state.
Does a permit exemption mean no rules apply?
No. The project must comply with the development plan and the building code just the same; only the authority does not check it in advance. Mistakes are the owner's risk.
Is a Bauvorbescheid the same as a permit?
No. It answers the questions you asked, bindingly, but you still need the permit (or the exemption procedure) before you build.

General information, not legal advice. What applies to a plot follows from its development plan and the state’s building code; the building authority decides bindingly.