Guides
German planning law in plain English, for people who buy or build in Germany without reading German. The general answer is here; what applies to a specific plot is in that plot’s development plan.
Before you buy
Can the plot be built on, what else weighs on it, and how buying works.
- Is my plot buildable? How to check land in Germany
Whether a plot in Germany can be built on depends on the Bebauungsplan or §§ 34 and 35 BauGB, on access and services, and on limits such as flood areas or Baulasten.
- Buying land in Germany as a foreigner: what to check before you sign
Anyone can buy land in Germany. Before the notary appointment, check the development plan, Baulasten, flood areas and access, and settle your project first.
- Building without a development plan: § 34 and § 35 BauGB
Without a Bebauungsplan, § 34 BauGB applies inside built-up areas (a project must fit in with its surroundings) and § 35 BauGB outside them (mainly privileged projects).
Understanding the plan
What a Bebauungsplan sets, how to read it, and the German terms.
- How to read a Bebauungsplan (German development plan)
How to read a German development plan: the Nutzungsschablone gives area type, storeys, GRZ, GFZ and building pattern; the written rules add what the drawing cannot.
- GRZ and GFZ explained: how much you may build on a German plot
GRZ times the plot area gives the permitted footprint, GFZ times the plot area the permitted floor area. With a worked example and the rule for garages.
- German planning terms in English: a glossary for buyers and builders
Bebauungsplan, Baugrenze, GRZ, GFZ, Vollgeschoss, Abstandsfläche, Bauvoranfrage and more: the German planning and building terms you will meet, explained in English.
Building
Setbacks, permits and who decides.
- Setbacks in Germany: Abstandsflächen by state
How close to the boundary you may build is set by each German state's building code, usually 0.4 times the wall height and at least 3 m. The rule for all 16 states.
- Building permits in Germany: Bauvoranfrage, Bauantrag and permit exemption
Who decides on a building project in Germany, when you need a permit, how a preliminary building enquiry works and why the application needs an architect or engineer.
More guides, in German: Ratgeber.