WAII0,4B-Plan Auskunft.deGerman development plans, read · Germany

Understanding the plan · updated 18 November 2026

German planning terms in English: a glossary for buyers and builders

German planning documents, building authorities and notaries use their own words, and many have no exact English equivalent. This glossary gives each term as you will meet it, with a short explanation. Keep using the German word when you talk to the town hall: it is the one they know.

The plans

  • Bebauungsplan (B-Plan): development plan. A bylaw of the municipality that sets bindingly what may be built in part of its area (§§ 8–10 BauGB).
  • Flächennutzungsplan (FNP): land-use plan for the whole municipality. It shows intended development but gives no right to build.
  • Vorhabenbezogener Bebauungsplan: project-specific development plan, made for one developer's project (§ 12 BauGB).
  • Planzeichnung: the plan drawing.
  • Textliche Festsetzungen: the written rules of the plan.
  • Begründung: the explanatory statement. It explains the plan but does not bind.
  • Nutzungsschablone: the small table in the drawing with the key figures for one part of the plan.
  • Geltungsbereich: the area a plan covers.
  • Änderung: amendment of a plan.
  • Veränderungssperre: development freeze while a plan is being made or changed (§ 14 BauGB).

Type and extent of use

  • Art der baulichen Nutzung: type of use. Set by area types of the Land Use Ordinance (BauNVO):
    • WR reines Wohngebiet, purely residential area
    • WA allgemeines Wohngebiet, general residential area
    • MI Mischgebiet, mixed area
    • MU urbanes Gebiet, urban area
    • MK Kerngebiet, core area (town centre)
    • GE Gewerbegebiet, commercial area
    • GI Industriegebiet, industrial area
    • SO Sondergebiet, special area
  • Maß der baulichen Nutzung: extent of use: how much may be built.
  • GRZ (Grundflächenzahl): site coverage ratio: footprint ÷ plot area.
  • GFZ (Geschossflächenzahl): floor area ratio: floor area of all full storeys ÷ plot area.
  • BMZ (Baumassenzahl): building volume ratio, in m³ per m² of plot.
  • Vollgeschoss: full storey, as defined by the state's building code. A Roman numeral in the plan (II) is the maximum; a circled one is compulsory.
  • TH / FH / OK: Traufhöhe (eaves height), Firsthöhe (ridge height), Oberkante (top edge).

Where on the plot

  • Baugrenze: building limit: a building may not cross it.
  • Baulinie: building line: a building must be built on it.
  • Baufenster: building envelope: the area enclosed by Baugrenzen or Baulinien, where the main building must stand.
  • Bauweise: building pattern: o offen (open, with side gaps), g geschlossen (closed, joined), a abweichend (deviating, as the plan says).
  • E / D / ED / H: detached houses only / semi-detached only / both / terraces.
  • Abstandsfläche: setback area that must be kept free in front of a wall, set by the state's building code.
  • Nebenanlagen: outbuildings such as sheds; Stellplätze parking spaces; Garage, Carport.

Roofs

  • SD Satteldach, gable roof · WD Walmdach, hipped roof · PD Pultdach, mono-pitch roof · FD Flachdach, flat roof · Dachneigung, roof pitch.

Without a plan

  • Innenbereich (§ 34 BauGB): inside a built-up area: a project must fit in with its surroundings.
  • Außenbereich (§ 35 BauGB): outside built-up areas: as a rule only privileged projects.

Authorities and procedures

  • Gemeinde: municipality. Bauamt / Bauaufsichtsbehörde: building authority.
  • Bauvoranfrage / Bauvorbescheid: preliminary building enquiry / the authority's binding answer to it.
  • Bauantrag / Baugenehmigung: building application / building permit.
  • Genehmigungsfreistellung: permit exemption for certain projects that comply with a development plan.
  • Befreiung / Ausnahme (§ 31 BauGB): exemption from a plan's rule / exception the plan itself allows.
  • Landesbauordnung (LBO, BauO): the state's building code.

Property

  • Grundbuch: land register at the local court. Flurstück: land parcel. Gemarkung / Flur: cadastral district / section.
  • Liegenschaftskataster (ALKIS): cadastre, the official map of parcels.
  • Baulast: obligation registered with the building authority (not in the Grundbuch). Grunddienstbarkeit: easement in the Grundbuch.
  • Erschließung: access and services (road, water, sewage, power). Erschließungsbeitrag: development charge.
  • Bodenrichtwert: standard land value. Grunderwerbsteuer: land transfer tax.

Questions

Why keep the German words?
Because plans, permits and contracts use them, and an English word can mean something slightly different. "Building line" for Baulinie, for example, says less than the German term: you must build on it, not only behind it.
Is there an official English translation of German building law?
The Federal Ministry of Justice publishes unofficial English translations of some federal laws. The Land Use Ordinance, the state building codes and development plans exist in German only.
Where do I see these terms in a real plan?
In the plan drawing's key (Zeichenerklärung) and in the Nutzungsschablone of each part of the plan. The B-Plan Auskunft report shows the values of the plan at your plot with these terms, in English, and names where each one is written.

General information, not legal advice. What applies to a plot follows from its development plan and the state’s building code; the building authority decides bindingly.